Evyap Sabun (M) Sdn. Bhd.
Fire Fighting Services
-
Sprinkler system
-
- Upright standard response sprinkler head of 68˚c with K-factor = 115 (warehouse), and K-factor = 80 (others)
- Pendent standard response sprinkler head of 68˚c with K-factor = 80 (celing area)
- In-Rack quick response sprinkler head of 68˚c with K-factor = 115
-
-
Hosereel System
-
- Was installed at all building & plant and comply to local authority & UBBL
-
-
Hydrant System
-
- 30nos of hydrant pillar which comply to local authority & UBBL
-
-
Wet Riser
-
- Installed at glycerine plant & fractionation plant which comply to local authority & UBBL.
- Equip with pressure regulatiing landing valve with 65mm canvas hose
-
-
Addressable Fire Alarm System
-
- EST3 system
- Manual call point (all building & plant), heat detector (packing area)
-
-
FM200 system
-
- 11 rooms was ocupied with the system which comply to NFPA 2000
-
-
CO2 System
-
- 10 rooms was ocupied with the system which comply to local authority & UBBL.
-
-
Deluge System was installed at Hydrogenation plant with :
-
- 4nos of deluge valve with open nozzle sprinkler
- System detection by explosion proof breakglass c/w bell & flame detector
- 2nos of foam monitor installed at building perimeter
-
-
Pump Sets
- 1st sets of pump which comply to NFPA for sprinkler, pressurise hydrant & hosereel system
- Consists of :
- 2nd sets of pump which comply to local authority for wet riser system
- Consists of :