Luzi

Project Info

  • Category

    Factory / Industry, Key Projects

  • Duration

    7 Months

  • Scope of Works

    Retrofit, M&E System, C&S Work

Want create site? Find Free WordPress Themes and plugins.
Electrical System
  • SSB/DB & submain cable
  • Lighting & exhaust fan
  • Isolator & power socket outlets

 

HVAC System
  • 100% fresh air supply type air conditioning equipment & recirculation split type
    air conditioning.
  • Explosion-proof exhaust air fans.

 

Fire Protection System
  • Fire alarm system
  • Portable fire extinguisher system
  • Hosereel system
  • Hydrant system
  • Automatic sprinkler system

 

Compressed Air System
  • Stainless steel compressed air main link & sub distribution
  • Compressed air drop point c/w isolation valve & quick coupler.

 

Cold & Hot Water Supply System
  • Stainless steel water storage tank & booster pump installation c/w piping
    connection.

 

Cold Room
  • Temperature: 6°C +- 2°C
  • Cooling capacity: 7HP
  • Room size:
    • Precool chamber: 3m x 6.5m x 5m (H)
    • Cold room chamber: 9.5m x 6.5m x 5m

 

Hot Room
  • Temperature: 50°C to 55°C
  • Electrical reheat 8kw refrigerant reheat system 30,000btu/hr.
  • Room size:
    • Preheat chamber: 3m x 6.5m x 5m (H)
    • Hot room chamber: 6.5m x 6.5m x 5m (H)

 

Storage Racking System
  • Heavy duty selective pallet racking system
  • Heavy duty racking system
  • Boltless shelving system & accessories

 

Lab Furniture
  • Workbench, epoxy sink, balance table & slab with grey epoxy resin workshop c/w
    high backsplash.

 

Structure Works
  • PU panel for partition
  • Laminated ceiling
  • Tempered viewing glass & tempered glass auto sliding door.
Did you find apk for android? You can find new Free Android Games and apps.