Hershey

Project Info

  • Category

    Consumer & Food Product, Key Projects

  • Duration

    13 Months

  • Scope of Works

    Fire Protection System, NFPA Compliance, FM Compliance, GBI Gold Compliance

Want create site? Find Free WordPress Themes and plugins.
Fire Protection System

 

  •  Sprinkler system
      • Upright standard response sprinkler head of 74˚c with K-factor = 115 (roofing area)
      • Pendent quick response sprinkler head (fusible link type) of 74˚c with K-factor = 360 for warehouse and packaging area
      • Pendent quick response sprinkler head (fusible link type) of 74˚c with K-factor = 115 for manufacturing, production area and cold room area.
      • All sprinkler system comply with FM Global standard.

     

  •  Hosereel System
      • Was installed at all building & plant and comply to local authority & UBBL
      • 65mm hosereel equipment was installed at warehouse area

     

  • Hydrant System
      • Pressurised hydrant system which comply to FM global standard

     

  • Addressable Fire Alarm System
      • Notifier system
      • Comply with FM Global standard

     

  • FM200 system
      • Server room at admin building which comply to FM Global

     

  • CO2 System
      • 6 substation rooms with the system which comply to local authority & UBBL.

     

  • Pump Sets
    • 1st sets of pump which comply to FM Global for sprinkler & pressurise hydrant
    • Consists of :
    • 2nd sets of pump which comply to local authority for hosereel system
    • Consists of :