Evyap Sabun

Project Info

  • Category

    Consumer & Food Product, Key Projects

  • Duration

    9 Months

  • Scope of Works

    Fire Protection System, NFPA Compliance

Want create site? Find Free WordPress Themes and plugins.
Fire Fighting Services

 

  • Sprinkler system
      • Upright standard response sprinkler head of 68˚c with K-factor = 115 (warehouse), and K-factor = 80 (others)
      • Pendent standard response sprinkler head of 68˚c with K-factor = 80 (celing area)
      • In-Rack quick response sprinkler head of 68˚c with K-factor = 115

     

  • Hosereel System
      • Was installed at all building & plant and comply to local authority & UBBL

     

  • Hydrant System
      • 30nos of hydrant pillar which comply to local authority & UBBL

     

  • Wet Riser
      • Installed at glycerine plant & fractionation plant which comply to local authority & UBBL.
      • Equip with pressure regulatiing landing valve with 65mm canvas hose

     

  • Addressable Fire Alarm System
      • EST3 system
      • Manual call point (all building & plant), heat detector (packing area)

     

  • FM200 system
      • 11 rooms was ocupied with the system which comply to NFPA 2000

     

  • CO2 System
      • 10 rooms was ocupied with the system which comply to local authority & UBBL.

     

  • Deluge System was installed at Hydrogenation plant with :
      • 4nos of deluge valve with open nozzle sprinkler
      • System detection by explosion proof breakglass c/w bell & flame detector
      • 2nos of foam monitor installed at building perimeter

     

  • Pump Sets
    • 1st sets of pump which comply to NFPA for sprinkler, pressurise hydrant & hosereel system
    • Consists of :

  • 2nd sets of pump which comply to local authority for wet riser system
    • Consists of :